Removal of a large and very thick mature Leyandii hedge
A recent project completed for a customer which involved the removal of a large and very thick mature Leyandii hedge. Once the hedge was removed the stumps were ground down to remove all signs that the hedge every existed. The difficult part of a project like this is having the correct equipment to dispose of the cut hedge. All in all 3 days work and 6 x large loads of tipper arisings chipped and disposed of. Without the correct equipment this job would have taken …… your guess is a good as mine ?